Most cited papers in Facilities and Workplace Management
What are the most cited papers in Facilities and Workplace Management?
The most cited paper in Facilities and Workplace Management is "A review on buildings energy consumption information" (Luis Pérez‐Lombard, José Ortiz, Christine Pout, 2007), with 6,641 citations. Next come "Integrating motivational, social, and contextual work design features: A meta-analytic summary and theoretical extension of the work design literature." (2,317) and "Causes of delay in large construction projects" (1,705).
Showing 50 of 100 papers. Every paper with more than 347 citations is listed.
| # | Paper | ||
|---|---|---|---|
| 1 | A review on buildings energy consumption information Luis Pérez‐Lombard, José Ortiz, Christine Pout · Energy and Buildings | 16 Mar 2007 | 6,641 |
| 2 | Integrating motivational, social, and contextual work design features: A meta-analytic summary and theoretical extension of the work design literature. Stephen E. Humphrey, Jennifer D. Nahrgang, Frederick P. Morgeson · Journal of Applied Psychology | 2007 | 2,317 |
| 3 | Causes of delay in large construction projects Sadi Assaf, Sadiq Al-Hejji · International Journal of Project Management | 16 Mar 2006 | 1,705 |
| 4 | Job satisfaction and job performance: A meta-analysis. Michelle T. Iaffaldano, Paul M. Muchinsky · Psychological Bulletin | Mar 1985 | 1,402 |
| 5 | Existing building retrofits: Methodology and state-of-the-art Zhenjun Ma, Paul W. Cooper, Daniel Daly et al. · Energy and Buildings | 23 Aug 2012 | 1,235 |
| 6 | Green building research–current status and future agenda: A review Jian Zuo, Zhen-Yu Zhao · Renewable and Sustainable Energy Reviews | 7 Nov 2013 | 1,198 |
| 7 | Sustainable construction—The role of environmental assessment tools Grace K. C. Ding · Journal of Environmental Management | 8 Feb 2007 | 1,159 |
| 8 | Location, location, location: contextualizing organizational research* Denise M. Rousseau, Yitzhak Fried · Journal of Organizational Behavior | Feb 2001 | 1,097 |
| 9 | The gap between predicted and measured energy performance of buildings: A framework for investigation Pieter de Wilde · Automation in Construction | 2 Mar 2014 | 1,045 |
| 10 | Application Areas and Data Requirements for BIM-Enabled Facilities Management Burçin Becerik-Gerber, Farrokh Jazizadeh, Nan Li et al. · Journal of Construction Engineering and Management | 15 Jun 2011 | 920 |
| 11 | Occupant behavior modeling for building performance simulation: Current state and future challenges Da Yan, William O’Brien, Tianzhen Hong et al. · Energy and Buildings | 18 Aug 2015 | 893 |
| 12 | Occupant productivity and office indoor environment quality: A review of the literature Yousef Al Horr, Mohammed Arif, Amit Kant Kaushik et al. · Building and Environment | 12 Jun 2016 | 850 |
| 13 | Impact of Working Environment on Job Satisfaction Abdul Raziq, Raheela Maula-Bakhsh · Procedia Economics and Finance | 2015 | 813 |
| 14 | Predicted vs. actual energy performance of non-domestic buildings: Using post-occupancy evaluation data to reduce the performance gap Anna Carolina Kossmann de Menezes, Andrew Cripps, Dino Bouchlaghem et al. · Applied Energy | 20 Dec 2011 | 769 |
| 15 | Working Alone Together Clay Spinuzzi · Journal of Business and Technical Communication | 30 May 2012 | 761 |
| 16 | BIM implementation throughout the UK construction project lifecycle: An analysis Robert Eadie, Mike Browne, Henry Agboola Odeyinka et al. · Automation in Construction | 28 Sep 2013 | 750 |
| 17 | Urban living labs for sustainability and low carbon cities in Europe: towards a research agenda Yuliya Voytenko Palgan, Kes McCormick, James Evans et al. · Journal of Cleaner Production | 21 Aug 2015 | 747 |
| 18 | Accessibility, usability and universal design—positioning and definition of concepts describing person-environment relationships Susanne Iwarsson, Agneta Ståhl · Disability and Rehabilitation | 2003 | 729 |
| 19 | A critical review of building environmental assessment tools Appu Haapio, Pertti Viitaniemi · Environmental Impact Assessment Review | 15 Feb 2008 | 700 |
| 20 | Fundamental uncertainties in projects and the scope of project management Roger J. Atkinson, Lynn Heather Crawford, Stephen C. Ward · International Journal of Project Management | Nov 2006 | 692 |
| 21 | Barriers and drivers for sustainable building Tarja Häkkinen, Kaisa Belloni · Building Research & Information | 12 Apr 2011 | 690 |
| 22 | Factors affecting safety performance on construction sites Edwin Sawacha, Shamil George Naoum, Daniel Fong · International Journal of Project Management | Oct 1999 | 676 |
| 23 | Workspace satisfaction: The privacy-communication trade-off in open-plan offices Jungsoo Kim, Richard de Dear · Journal of Environmental Psychology | 29 Jun 2013 | 675 |
| 24 | Enhancing environmental sustainability over building life cycles through green BIM: A review Johnny Kwok Wai Wong, Jason Xin Zhou · Automation in Construction | 24 Jun 2015 | 674 |
| 25 | Critical evaluation of off-site construction research: A Scientometric analysis M. Reza Hosseini, Igor Martek, Edmundas Kazimieras Zavadskas et al. · Automation in Construction | 2 Jan 2018 | 647 |
| 26 | Life cycle performance of modular buildings: A critical review Mohammad Hāshim Kamali, Kasun Hewage · Renewable and Sustainable Energy Reviews | 25 May 2016 | 642 |
| 27 | A critical comparison of green building rating systems Dat Tien Doan, Ali GhaffarianHoseini, Nicola Naismith et al. · Building and Environment | 8 Jul 2017 | 631 |
| 28 | Lightswitch-2002: a model for manual and automated control of electric lighting and blinds Christoph F. Reinhart · Solar Energy | 2004 | 630 |
| 29 | Occupant preferences and satisfaction with the luminous environment and control systems in daylit offices: a literature review Anca D. Galasiu, Jennifer A. Veitch · Energy and Buildings | 5 May 2006 | 630 |
| 30 | Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects Shamas‐ur‐Rehman Toor, Stephen O. Ogunlana · International Journal of Project Management | 10 Jun 2009 | 625 |
| 31 | Work‐from‐anywhere : The productivity effects of geographic flexibility Prithwiraj Choudhury, Cirrus Foroughi, Barbara Zepp Larson · Strategic Management Journal | 27 Oct 2020 | 613 |
| 32 | Cost escalation and schedule delays in road construction projects in Zambia Chabota Kaliba, Mundia Muya, Kanyuka Mumba · International Journal of Project Management | 20 Aug 2008 | 597 |
| 33 | The effects of construction delays on project delivery in Nigerian construction industry Ajibade A. Aibinu, Godwin Onajite Jagboro · International Journal of Project Management | 17 Sep 2002 | 596 |
| 34 | Green Noise or Green Value? Measuring the Effects of Environmental Certification on Office Values Franz Fuerst, Patrick M. McAllister · Real Estate Economics | Dec 2010 | 590 |
| 35 | Technology adoption in the BIM implementation for lean architectural practice Yusuf Arayıcı, Paul M. Coates, Lauri Koskela et al. · Automation in Construction | 22 Oct 2010 | 563 |
| 36 | Significant factors causing delay in the UAE construction industry Arshi Shakeel Faridi, Sameh Monir El-Sayegh · Construction Management and Economics | Nov 2006 | 552 |
| 37 | Critical barriers to green building technologies adoption in developing countries: The case of Ghana Albert P.C. Chan, Amos Darko, Ayokunle Olubunmi Olanipekun et al. · Journal of Cleaner Production | 26 Oct 2017 | 549 |
| 38 | Delays in construction projects: The case of Jordan Ghaleb Jalil Sweis, Rateb Jalil Sweis, Ayman A. Abu Hammad et al. · International Journal of Project Management | 4 Dec 2007 | 534 |
| 39 | Energy Efficiency in Sustainable Buildings: A Systematic Review with Taxonomy, Challenges, Motivations, Methodological Aspects, Recommendations, and Pathways for Future Research Fatma S. Hafez, Bahaaeddin Sa'di, M. Safa-Gamal et al. · Energy Strategy Reviews | 6 Dec 2022 | 526 |
| 40 | Data-driven predictive maintenance planning framework for MEP components based on BIM and IoT using machine learning algorithms Jack C.P. Cheng, Weiwei Chen, Keyu Chen et al. · Automation in Construction | 31 Jan 2020 | 517 |
| 41 | Wearable technology for personalized construction safety monitoring and trending: Review of applicable devices Ibukun Awolusi, Eric Marks, Matthew Ryan Hallowell · Automation in Construction | 18 Oct 2017 | 506 |
| 42 | The effects of indoor air quality on performance and productivity David Peter Wyon · Indoor Air | Aug 2004 | 500 |
| 43 | The significant factors causing delay of building construction projects in Malaysia Wa’el Alaghbari, Mohd Razali Abdul Kadir, Azizah Salim et al. · Engineering Construction & Architectural Management | 28 Feb 2007 | 489 |
| 44 | The effects of the physical environment on job performance: towards a theoretical model of workspace stress Jacqueline C. Vischer · Stress and Health | 8 Feb 2007 | 485 |
| 45 | Co-constructing a Sense of Community at Work: The Emergence of Community in Coworking Spaces Lyndon Earl Garrett, Gretchen Marie Spreitzer, Peter Bacevice · Organization Studies | 2 Feb 2017 | 481 |
| 46 | Cost and time control of construction projects: inhibiting factors and mitigating measures in practice Yakubu A. Olawale, Ming Sun · Construction Management and Economics | May 2010 | 477 |
| 47 | Causes of Delay in Building Construction Projects in Egypt Mohamed Emam Abd El-Razek, Hesham Bassioni, A. M. Mobarak · Journal of Construction Engineering and Management | 17 Oct 2008 | 466 |
| 48 | A review of benchmarking, rating and labelling concepts within the framework of building energy certification schemes Luis Pérez‐Lombard, José Ortiz, R. González et al. · Energy and Buildings | 26 Oct 2008 | 464 |
| 49 | Delays and cost increases in the construction of private residential projects in Kuwait Parviz Amir Koushki, K. Al‐Rashid, Nabil Kartam · Construction Management and Economics | Mar 2005 | 457 |
| 50 | Risk assessment and allocation in the UAE construction industry Sameh Monir El-Sayegh · International Journal of Project Management | 5 Sep 2007 | 457 |
Citations are OpenAlex's own counts, from its 2026-09-23 snapshot, so the ranking can differ from Google Scholar or Web of Science. A paper is listed for a field when OpenAlex files it under one of the field's topics; retracted papers and papers whose citation count cannot be traced to citing works are left out, and a preprint and the article it became are shown once. Release dates are OpenAlex's: where a source gave only a month or a year, that is what is shown. How the lists are chosen.