Moslem Sheikhkhoshkar
Moslem Sheikhkhoshkar publishes mostly in Building and Construction, Management Science and Operations Research and Industrial and Manufacturing Engineering, on topics such as BIM and Construction Integration, Construction Project Management and Performance and Manufacturing Process and Optimization.
- World rank
- #676,792 of 7,710,434 ranked researchers
- Rank in France
- #33,682 of 324,115
- Works
- 40
- Citations
- 806
- Citations per work
- 20.2
What does Moslem Sheikhkhoshkar research?
Moslem Sheikhkhoshkar's work is mostly in Engineering (42%), Decision Sciences (16%), Earth and Planetary Sciences (4%).
Their six largest subfields, inside their fields and domains; the grey slice is everything else they publish. The interactive view splits every one of their works down to single topics.
The fields and subfields, with their numbers
- Physical Sciences1846.0%
- Engineering1741.9%
- Earth and Planetary Sciences24.1%
- Everything else1333.6%
- Social Sciences820.4%
- 1Building and Construction29% of their works
- 2Management Science and Operations Research16% of their works
- 3Industrial and Manufacturing Engineering9% of their works
- 4Civil and Structural Engineering4% of their works
- 5Geology4% of their works
- 6Management Information Systems4% of their works
Research topics
- BIM and Construction Integration
- Construction Project Management and Performance
- Manufacturing Process and Optimization
- 3D Surveying and Cultural Heritage
- Infrastructure Maintenance and Monitoring
- Digital Transformation in Industry
- Resource-Constrained Project Scheduling
- Innovations in Concrete and Construction Materials
Which keywords describe Moslem Sheikhkhoshkar's research?
The keywords of their largest research topics: Risk Management, Sustainability, BIM, Construction, Supply Chain Management, Construction Projects, Project Success and Assembly Planning.
- 3D Printing
- Resource-Constrained
- Digital Twin
- Photogrammetry
- Deep Learning
- Assembly Planning
- Construction Projects
- Construction
- Sustainability
- Risk Management
- BIM
- Supply Chain Management
- Project Success
- Design for Manufacture
- Pavement
- UAV
- Project Scheduling
- Smart Manufacturing
- Concrete Extrusion
Size is their works in the topics tagged with each word, from their 8 largest topics. Each links to the topic it comes from most. The words come from the keyword list OpenAlex gives each topic, not from the text of the papers, so a word can appear that none of the papers uses.
All 19 words, with their numbers
- Risk Management342 topics
- Sustainability262 topics
- BIM231 topic
- Construction231 topic
- Supply Chain Management142 topics
- Construction Projects111 topic
- Project Success111 topic
- Assembly Planning51 topic
- Design for Manufacture51 topic
- Deep Learning41 topic
- Pavement41 topic
- Photogrammetry41 topic
- UAV41 topic
- Digital Twin31 topic
- Project Scheduling31 topic
- Resource-Constrained31 topic
- Smart Manufacturing31 topic
- 3D Printing21 topic
- Concrete Extrusion21 topic
Where does Moslem Sheikhkhoshkar work?
Moslem Sheikhkhoshkar's main affiliation in the publication record is Université de Lorraine, France.
How many publications and citations does Moslem Sheikhkhoshkar have?
OpenAlex counts 40 works and 806 citations for Moslem Sheikhkhoshkar, an h-index of 15, ranking #676,792 of 7,710,434 researchers worldwide on the quality score.
Ranked on field-normalised citation excellence (50%), output (30%) and citations (20%). Counts come from OpenAlex author records, which occasionally merge different people who share a name or split one person into several.
Papers, co-authors, who cited this work and researchers on the nearest topics have tabs of their own, above. Is this your page? Claim it with your ORCID iD, or request a correction or removal.
Discussion
Ask a question or share a note about Moslem Sheikhkhoshkar. Keep it to the research: no personal attacks, advertising or links. Any reader can report a post, which collapses it for everyone until it is opened.