Kuo-Shun Sun
Kuo-Shun Sun publishes mostly in Management Science and Operations Research, Building and Construction and Industrial and Manufacturing Engineering, on topics such as BIM and Construction Integration, Resource-Constrained Project Scheduling and Construction Project Management and Performance.
- World rank
- #2,879,383 of 7,710,434 ranked researchers
- Rank in Taiwan
- #19,350 of 57,035
- Works
- 23
- Citations
- 346
- Citations per work
- 15.0
What does Kuo-Shun Sun research?
Kuo-Shun Sun's work is mostly in Engineering (28%), Decision Sciences (23%), Health Professions (7%).
Their six largest subfields, inside their fields and domains; the grey slice is everything else they publish. The interactive view splits every one of their works down to single topics.
The fields and subfields, with their numbers
- Social Sciences832.9%
- Everything else832.7%
- Physical Sciences627.8%
- Engineering627.8%
- Health Sciences26.6%
- Health Professions26.6%
- 1Management Science and Operations Research23% of their works
- 2Building and Construction18% of their works
- 3Industrial and Manufacturing Engineering10% of their works
- 4Organizational Behavior and Human Resource Management7% of their works
- 5Radiological and Ultrasound Technology7% of their works
- 6Economics and Econometrics3% of their works
Research topics
- BIM and Construction Integration
- Resource-Constrained Project Scheduling
- Construction Project Management and Performance
- Occupational Health and Safety Research
- Manufacturing Process and Optimization
- Scheduling and Optimization Algorithms
- Customer Service Quality and Loyalty
- Innovations in Concrete and Construction Materials
Which keywords describe Kuo-Shun Sun's research?
The keywords of their largest research topics: Risk Management, Genetic Algorithm, BIM, Construction, Project Scheduling, Resource-Constrained, Construction Projects and Project Success.
- Concrete Extrusion
- Service Quality
- Manufacturing
- Customer Satisfaction
- Safety Culture
- Project Success
- Resource-Constrained
- Construction
- Genetic Algorithm
- Risk Management
- BIM
- Project Scheduling
- Construction Projects
- Occupational Safety
- Assembly Planning
- Design for Manufacture
- Scheduling
- 3D Printing
Size is their works in the topics tagged with each word, from their 8 largest topics. Each links to the topic it comes from most. The words come from the keyword list OpenAlex gives each topic, not from the text of the papers, so a word can appear that none of the papers uses.
All 18 words, with their numbers
- Risk Management142 topics
- Genetic Algorithm102 topics
- BIM81 topic
- Construction81 topic
- Project Scheduling71 topic
- Resource-Constrained71 topic
- Construction Projects61 topic
- Project Success61 topic
- Occupational Safety41 topic
- Safety Culture41 topic
- Assembly Planning31 topic
- Customer Satisfaction31 topic
- Design for Manufacture31 topic
- Manufacturing31 topic
- Scheduling31 topic
- Service Quality31 topic
- 3D Printing21 topic
- Concrete Extrusion21 topic
Where does Kuo-Shun Sun work?
Kuo-Shun Sun's main affiliation in the publication record is Kainan University, Taiwan.
How many publications and citations does Kuo-Shun Sun have?
OpenAlex counts 23 works and 346 citations for Kuo-Shun Sun, an h-index of 11, ranking #2,879,383 of 7,710,434 researchers worldwide on the quality score.
Ranked on field-normalised citation excellence (50%), output (30%) and citations (20%). Counts come from OpenAlex author records, which occasionally merge different people who share a name or split one person into several.
Papers, co-authors, who cited this work and researchers on the nearest topics have tabs of their own, above. Is this your page? Claim it with your ORCID iD, or request a correction or removal.
Discussion
Ask a question or share a note about Kuo-Shun Sun. Keep it to the research: no personal attacks, advertising or links. Any reader can report a post, which collapses it for everyone until it is opened.