Erik L. Demeulemeester
Erik L. Demeulemeester publishes mostly in Management Science and Operations Research, Industrial and Manufacturing Engineering and Emergency Medical Services, on topics such as Resource-Constrained Project Scheduling, Scheduling and Optimization Algorithms and Healthcare Operations and Scheduling Optimization.
- World rank
- #95,421 of 7,710,434 ranked researchers
- Rank in Belgium
- #599 of 67,186
- Works
- 351
- Citations
- 13k
- Citations per work
- 37.1
What does Erik L. Demeulemeester research?
Erik L. Demeulemeester's work is mostly in Decision Sciences (37%), Engineering (26%), Health Professions (8%).
Their six largest subfields, inside their fields and domains; the grey slice is everything else they publish. The interactive view splits every one of their works down to single topics.
The fields and subfields, with their numbers
- Social Sciences14140.2%
- Decision Sciences13036.9%
- Business, Management and Accounting123.3%
- Physical Sciences9828.0%
- Engineering9025.6%
- Computer Science82.4%
- Everything else8223.5%
- Health Sciences298.3%
- Health Professions298.3%
- 1Management Science and Operations Research37% of their works
- 2Industrial and Manufacturing Engineering23% of their works
- 3Emergency Medical Services8% of their works
- 4Strategy and Management3% of their works
- 5Building and Construction3% of their works
- 6Computer Networks and Communications2% of their works
Research topics
- Resource-Constrained Project Scheduling
- Scheduling and Optimization Algorithms
- Healthcare Operations and Scheduling Optimization
- Construction Project Management and Performance
- Scheduling and Timetabling Solutions
- Operations Management Techniques
- Vehicle Routing Optimization Methods
- BIM and Construction Integration
Which keywords describe Erik L. Demeulemeester's research?
The keywords of their largest research topics: Genetic Algorithm, Optimization, Scheduling, Metaheuristics, Project Scheduling, Resource-Constrained, Flexible Job-shop and Manufacturing.
- BIM
- Heuristic Algorithms
- Operations Management
- Rostering
- Construction Projects
- Healthcare
- Manufacturing
- Resource-Constrained
- Metaheuristics
- Optimization
- Genetic Algorithm
- Scheduling
- Project Scheduling
- Flexible Job-shop
- Risk Management
- Operating Room
- Project Success
- Timetabling
- Theory of Constraints
- Vehicle Routing Problem
- Construction
Size is their works in the topics tagged with each word, from their 8 largest topics. Each links to the topic it comes from most.
All 21 words, with their numbers
- Genetic Algorithm2822 topics
- Optimization2793 topics
- Scheduling2613 topics
- Metaheuristics2303 topics
- Project Scheduling1501 topic
- Resource-Constrained1501 topic
- Flexible Job-shop1321 topic
- Manufacturing1321 topic
- Risk Management862 topics
- Healthcare741 topic
- Operating Room741 topic
- Construction Projects631 topic
- Project Success631 topic
- Rostering551 topic
- Timetabling551 topic
- Operations Management401 topic
- Theory of Constraints401 topic
- Heuristic Algorithms251 topic
- Vehicle Routing Problem251 topic
- BIM231 topic
- Construction231 topic
Where does Erik L. Demeulemeester work?
Erik L. Demeulemeester's main affiliation in the publication record is KU Leuven, Belgium.
How many publications and citations does Erik L. Demeulemeester have?
OpenAlex counts 351 works and 13,031 citations for Erik L. Demeulemeester, an h-index of 56, ranking #95,421 of 7,710,434 researchers worldwide on the quality score.
Ranked on field-normalised excellence (50%), output (30%) and citations (20%). Counts come from OpenAlex author records, which occasionally merge different people who share a name or split one person into several.
Papers, co-authors, who cited this work and researchers on the nearest topics have tabs of their own, above. Is this your page? Claim it with your ORCID iD, or request a correction or removal.
Discussion
Ask a question or share a note about Erik L. Demeulemeester. Posts are plain text and can be reported.