Erik Demeulemeester
Erik Demeulemeester publishes mostly in Management Science and Operations Research, Industrial and Manufacturing Engineering and Emergency Medical Services, on topics such as Resource-Constrained Project Scheduling, Scheduling and Optimization Algorithms and Healthcare Operations and Scheduling Optimization.
- World rank
- #29,134 of 1,633,909 ranked researchers
- Rank in Belgium
- #226 of 18,604
- Works
- 88
- Citations
- 701
- Citations per work
- 8.0
What does Erik Demeulemeester research?
Shares of their own output, by the field each of their topics belongs to. The grey slice is everything not listed.
- 1Management Science and Operations Research37% of their works
- 2Industrial and Manufacturing Engineering23% of their works
- 3Emergency Medical Services10% of their works
- 4Strategy and Management4% of their works
- 5Information Systems3% of their works
- 6Control and Systems Engineering3% of their works
Research topics
- Resource-Constrained Project Scheduling
- Scheduling and Optimization Algorithms
- Healthcare Operations and Scheduling Optimization
- Scheduling and Timetabling Solutions
- Construction Project Management and Performance
- Operations Management Techniques
- Software Engineering Techniques and Practices
- Manufacturing Process and Optimization
Which keywords describe Erik Demeulemeester's research?
The keywords of their largest research topics: Optimization, Scheduling, Genetic Algorithm, Metaheuristics, Project Scheduling, Resource-Constrained, Flexible Job-shop and Manufacturing.
- Empirical Studies
- Assembly Planning
- Theory of Constraints
- Operations Management
- Timetabling
- Operating Room
- Manufacturing
- Resource-Constrained
- Metaheuristics
- Scheduling
- Optimization
- Genetic Algorithm
- Project Scheduling
- Flexible Job-shop
- Healthcare
- Rostering
- Construction Projects
- Project Success
- Agile Software Development
- Design for Manufacture
Size is their works in the topics tagged with each word, from their 8 largest topics. Each links to the topic it comes from most.
All 20 words, with their numbers
- Optimization403 topics
- Scheduling363 topics
- Genetic Algorithm322 topics
- Metaheuristics282 topics
- Project Scheduling181 topic
- Resource-Constrained181 topic
- Flexible Job-shop141 topic
- Manufacturing141 topic
- Healthcare121 topic
- Operating Room121 topic
- Rostering101 topic
- Timetabling101 topic
- Construction Projects61 topic
- Operations Management61 topic
- Project Success61 topic
- Theory of Constraints61 topic
- Agile Software Development41 topic
- Assembly Planning41 topic
- Design for Manufacture41 topic
- Empirical Studies41 topic
Where does Erik Demeulemeester work?
Erik Demeulemeester's main affiliation in the publication record is KU Leuven, Belgium.
How many publications and citations does Erik Demeulemeester have?
Science Explorer counts 88 works and 701 citations for Erik Demeulemeester, ranking #29,134 of 1,633,909 researchers worldwide on the composite score.
Ranked on field-normalised excellence (50%), output (30%) and citations (20%). Counts come from OpenAlex author records, which occasionally merge different people who share a name or split one person into several.
Papers, co-authors, who cited this work and researchers on the nearest topics are in the interactive view on the map. Is this your page? Request a correction or removal.