Cheryl D. Coon
Cheryl D. Coon publishes mostly in Oncology, Economics and Econometrics and Statistics and Probability, on topics such as Cancer Immunotherapy and Biomarkers, Gastrointestinal motility and disorders and Cutaneous Melanoma Detection and Management.
- World rank
- #2,114,231 of 7,710,434 ranked researchers
- Rank in United States
- #637,689 of 1,627,098
- Works
- 35
- Citations
- 636
- Citations per work
- 18.2
What does Cheryl D. Coon research?
Cheryl D. Coon's work is mostly in Medicine (29%), Economics, Econometrics and Finance (7%), Mathematics (6%).
Their six largest subfields, inside their fields and domains; the grey slice is everything else they publish. The interactive view splits every one of their works down to single topics.
The fields and subfields, with their numbers
- Everything else1852.3%
- Health Sciences1029.1%
- Medicine1029.1%
- Social Sciences412.8%
- Physical Sciences25.8%
- Mathematics25.8%
- 1Oncology19% of their works
- 2Economics and Econometrics7% of their works
- 3Statistics and Probability6% of their works
- 4Statistics, Probability and Uncertainty6% of their works
- 5Gastroenterology6% of their works
- 6Epidemiology5% of their works
Research topics
Which keywords describe Cheryl D. Coon's research?
The keywords of their largest research topics: Melanoma, Immune Checkpoint Blockade, PD-1 and PD-L1, Gastrointestinal Disorders, Irritable Bowel Syndrome, Cancer Survivorship, Dermoscopy and Measurement Invariance.
- False Discovery Rate
- Adaptive Designs
- Skin Cancer
- PRISMA Statement
- Measurement Invariance
- Cancer Survivorship
- Gastrointestinal Disorders
- Immune Checkpoint Blockade
- Melanoma
- PD-1 and PD-L1
- Irritable Bowel Syndrome
- Dermoscopy
- Meta-Analysis
- Quality of Life
- Structural Equation Modeling
- BRAF gene
- MAP Kinase
Size is their works in the topics tagged with each word, from their 8 largest topics. Each links to the topic it comes from most. The words come from the keyword list OpenAlex gives each topic, not from the text of the papers, so a word can appear that none of the papers uses.
All 17 words, with their numbers
- Melanoma72 topics
- Immune Checkpoint Blockade61 topic
- PD-1 and PD-L161 topic
- Gastrointestinal Disorders51 topic
- Irritable Bowel Syndrome51 topic
- Cancer Survivorship41 topic
- Dermoscopy41 topic
- Measurement Invariance41 topic
- Meta-Analysis41 topic
- PRISMA Statement41 topic
- Quality of Life41 topic
- Skin Cancer41 topic
- Structural Equation Modeling41 topic
- Adaptive Designs31 topic
- BRAF gene31 topic
- False Discovery Rate31 topic
- MAP Kinase31 topic
Where does Cheryl D. Coon work?
Cheryl D. Coon's main affiliation in the publication record is Critical Path Institute, United States.
How many publications and citations does Cheryl D. Coon have?
OpenAlex counts 35 works and 636 citations for Cheryl D. Coon, an h-index of 12, ranking #2,114,231 of 7,710,434 researchers worldwide on the quality score.
Ranked on field-normalised citation excellence (50%), output (30%) and citations (20%). Counts come from OpenAlex author records, which occasionally merge different people who share a name or split one person into several.
Other researchers named Cheryl D. Coon
Papers, co-authors, who cited this work and researchers on the nearest topics have tabs of their own, above. Is this your page? Claim it with your ORCID iD, or request a correction or removal.
Discussion
Ask a question or share a note about Cheryl D. Coon. Keep it to the research: no personal attacks, advertising or links. Any reader can report a post, which collapses it for everyone until it is opened.