Science Explorer Back to mapMap
Discussion
Nonprofit · Tucson · United States

Critical Path Institute

In research, Critical Path Institute stands highest in Health Sciences (#6,577 of 16,688 worldwide), over all time.

World rank, 2022-now
#18,879
of 22,385 · #15,257 all time
Rank in United States
#2,786
of 3,332
Research works
267
▲ 41% vs 2018-21
Citations
6.7k
25.2 per fractional work
Top-10% rate
15.5%
all institutions 10.0%
vs its own fields
1.04×
1.00× is exactly expected
Open access
48%
world 40%
International
32%
world 18%

What is Critical Path Institute known for in research?

The fields where it stands highest, over all time, ranked among every institution above the floor in each field.

FieldWorld rankWhere that sitsTop-10% rateWorks
Health SciencesDomain #6,577 of 16,688 14.3%131

Each strip is that field's whole ranked pool, with the notch where Critical Path Institute sits in it, in the colour of the band that rank falls in. The track under the rate is the rate itself: it carries no average mark, because the average differs by field (from about 6% in Dentistry to 21% in Economics).

Which fields of science does Critical Path Institute work in?

In 2022-now, 48% of research at Critical Path Institute is in Health Sciences, 20% in Life Sciences. Its largest fields are Medicine (42%), Biochemistry, Genetics and Molecular Biology (15%), Computer Science (10%). It does 1.9× the world's share of Health Sciences.

Health Sciences: 38 fractional works · 48.4% of its workMedicine: 33 fractional works · 41.7% of its workRadiology, Nuclear Medicine and Imaging: 5 fractional works · 6.3% of its workOncology: 3 fractional works · 3.7% of its workSurgery: 3 fractional works · 3.5% of its workPulmonary and Respiratory Medicine: 3 fractional works · 3.4% of its workPublic Health, Environmental and Occupational Health: 3 fractional works · 3.2% of its workNeurology: 2 fractional works · 3.0% of its workPhysiology: 2 fractional works · 2.8% of its workPediatrics, Perinatology and Child Health: 2 fractional works · 2.4% of its workEpidemiology: 2 fractional works · 1.9% of its workInfectious Diseases: 1 fractional works · 1.5% of its workEndocrinology, Diabetes and Metabolism: 1 fractional works · 1.3% of its workHealth Informatics: 1 fractional works · 1.2% of its workPsychiatry and Mental health: 1 fractional works · 1.1% of its workNephrology: 1 fractional works · 0.9% of its workPathology and Forensic Medicine: 1 fractional works · 0.9% of its workCardiology and Cardiovascular Medicine: 1 fractional works · 0.7% of its workGastroenterology: 1 fractional works · 0.6% of its workHepatology: 0 fractional works · 0.6% of its workGenetics: 0 fractional works · 0.4% of its workTransplantation: 0 fractional works · 0.4% of its workReproductive Medicine: 0 fractional works · 0.4% of its workPharmacology: 0 fractional works · 0.3% of its workRheumatology: 0 fractional works · 0.3% of its workFamily Practice: 0 fractional works · 0.2% of its workObstetrics and Gynecology: 0 fractional works · 0.2% of its workSmaller subfields together: 1 fractional works · 0.7% of its workHealth Professions: 5 fractional works · 6.2% of its workGeneral Health Professions: 2 fractional works · 3.0% of its workHealth Information Management: 2 fractional works · 2.2% of its workPhysical Therapy, Sports Therapy and Rehabilitation: 0 fractional works · 0.4% of its workMedical Terminology: 0 fractional works · 0.3% of its workSpeech and Hearing: 0 fractional works · 0.2% of its workSmaller subfields together: 0 fractional works · 0.1% of its workVeterinary: 0 fractional works · 0.4% of its workSmall Animals: 0 fractional works · 0.4% of its workNursing: 0 fractional works · 0.1% of its workLife Sciences: 16 fractional works · 19.9% of its workBiochemistry, Genetics and Molecular Biology: 12 fractional works · 14.8% of its workMolecular Biology: 5 fractional works · 5.8% of its workGenetics: 4 fractional works · 4.7% of its workCancer Research: 2 fractional works · 2.9% of its workBiophysics: 1 fractional works · 0.8% of its workMolecular Medicine: 0 fractional works · 0.3% of its workEndocrinology: 0 fractional works · 0.2% of its workSmaller subfields together: 0 fractional works · 0.1% of its workNeuroscience: 2 fractional works · 3.0% of its workCellular and Molecular Neuroscience: 1 fractional works · 1.7% of its workCognitive Neuroscience: 1 fractional works · 1.1% of its workSmaller subfields together: 0 fractional works · 0.1% of its workImmunology and Microbiology: 1 fractional works · 1.2% of its workImmunology: 1 fractional works · 1.2% of its workSmaller subfields together: 0 fractional works · 0.0% of its workPharmacology, Toxicology and Pharmaceutics: 1 fractional works · 0.7% of its workToxicology: 0 fractional works · 0.4% of its workPharmacology: 0 fractional works · 0.3% of its workAgricultural and Biological Sciences: 0 fractional works · 0.2% of its workPhysical Sciences: 13 fractional works · 17.0% of its workComputer Science: 8 fractional works · 10.1% of its workArtificial Intelligence: 5 fractional works · 6.8% of its workComputational Theory and Mathematics: 2 fractional works · 2.1% of its workInformation Systems: 0 fractional works · 0.4% of its workSignal Processing: 0 fractional works · 0.4% of its workComputer Vision and Pattern Recognition: 0 fractional works · 0.3% of its workSmaller subfields together: 0 fractional works · 0.1% of its workMathematics: 2 fractional works · 2.9% of its workStatistics and Probability: 2 fractional works · 2.9% of its workEngineering: 2 fractional works · 2.3% of its workBiomedical Engineering: 1 fractional works · 1.6% of its workAerospace Engineering: 0 fractional works · 0.6% of its workSmaller subfields together: 0 fractional works · 0.1% of its workEnvironmental Science: 1 fractional works · 1.1% of its workHealth, Toxicology and Mutagenesis: 0 fractional works · 0.3% of its workEcology: 0 fractional works · 0.2% of its workManagement, Monitoring, Policy and Law: 0 fractional works · 0.2% of its workSmaller subfields together: 0 fractional works · 0.4% of its workMaterials Science: 0 fractional works · 0.4% of its workMaterials Chemistry: 0 fractional works · 0.4% of its workPhysics and Astronomy: 0 fractional works · 0.2% of its workRadiation: 0 fractional works · 0.2% of its workSocial Sciences: 12 fractional works · 14.7% of its workEconomics, Econometrics and Finance: 4 fractional works · 5.3% of its workEconomics and Econometrics: 4 fractional works · 5.3% of its workDecision Sciences: 4 fractional works · 5.1% of its workManagement Science and Operations Research: 2 fractional works · 3.0% of its workStatistics, Probability and Uncertainty: 1 fractional works · 1.8% of its workInformation Systems and Management: 0 fractional works · 0.2% of its workPsychology: 2 fractional works · 2.7% of its workClinical Psychology: 1 fractional works · 1.4% of its workApplied Psychology: 1 fractional works · 0.8% of its workExperimental and Cognitive Psychology: 0 fractional works · 0.3% of its workSmaller subfields together: 0 fractional works · 0.2% of its workSocial Sciences: 1 fractional works · 1.2% of its workSociology and Political Science: 1 fractional works · 0.8% of its workHealth: 0 fractional works · 0.3% of its workSmaller subfields together: 0 fractional works · 0.1% of its workArts and Humanities: 0 fractional works · 0.4% of its workHistory and Philosophy of Science: 0 fractional works · 0.3% of its workSmaller subfields together: 0 fractional works · 0.1% of its workBusiness, Management and Accounting: 0 fractional works · 0.2% of its workALL ITS WORKCritical PathInstitute79fractional works, 2022-now
Life Sciences20%Physical Sciences17%Health Sciences48%Social Sciences15%

Each ring splits the one inside it: the four domains of science, their fields, their subfields. Size is fractional works in 2022-now. Every slice is a page; the interactive view zooms down to single topics and colours each by how much more of it this institution does than the world.

Its 4 domains and 22 fields, with their numbers
    1. Medicine3341.7%
    2. Health Professions56.2%
    3. Veterinary00.4%
    4. Nursing00.1%
    1. Biochemistry, Genetics and Molecular Biology1214.8%
    2. Neuroscience23.0%
    3. Immunology and Microbiology11.2%
    4. Pharmacology, Toxicology and Pharmaceutics10.7%
    5. Agricultural and Biological Sciences00.2%
    1. Computer Science810.1%
    2. Mathematics22.9%
    3. Engineering22.3%
    4. Environmental Science11.1%
    5. Materials Science00.4%
    6. Physics and Astronomy00.2%
    7. Earth and Planetary Sciences00.0%
    1. Economics, Econometrics and Finance45.3%
    2. Decision Sciences45.1%
    3. Psychology22.7%
    4. Social Sciences11.2%
    5. Arts and Humanities00.4%
    6. Business, Management and Accounting00.2%
All of science, and how each field's share has moved since 1950: the Science domain explorer

Field profile

Location quotient across every field it publishes in: outside the ring is more than an institution of this size would be expected to publish, inside it is less.

Agricultural and Biological Sciences: 0.04× its world share, 0 worksAgricultural and Bio…Biochemistry, Genetics and Molecular Biology: 2.78× its world share, 12 worksBiochemistry, Geneti…Immunology and Microbiology: 1.22× its world share, 1 worksImmunology and Micro…Neuroscience: 1.82× its world share, 2 worksNeurosciencePharmacology, Toxicology and Pharmaceutics: 2.03× its world share, 1 worksPharmacology, Toxico…Computer Science: 1.30× its world share, 8 worksComputer ScienceEarth and Planetary Sciences: 0.01× its world share, 0 worksEarth and Planetary …Engineering: 0.15× its world share, 2 worksEngineeringEnvironmental Science: 0.22× its world share, 1 worksEnvironmental ScienceMaterials Science: 0.11× its world share, 0 worksMaterials ScienceMathematics: 2.45× its world share, 2 worksMathematicsPhysics and Astronomy: 0.09× its world share, 0 worksPhysics and AstronomyHealth Professions: 2.36× its world share, 5 worksHealth ProfessionsMedicine: 2.17× its world share, 33 worksMedicineNursing: 0.17× its world share, 0 worksNursingVeterinary: 2.92× its world share, 0 worksVeterinaryArts and Humanities: 0.13× its world share, 0 worksArts and HumanitiesBusiness, Management and Accounting: 0.06× its world share, 0 worksBusiness, Management…Decision Sciences: 5.23× its world share, 4 worksDecision SciencesEconomics, Econometrics and Finance: 2.46× its world share, 4 worksEconomics, Econometr…Psychology: 0.87× its world share, 2 worksPsychologySocial Sciences: 0.09× its world share, 1 worksSocial Sciences1×world share
more than its size predictsabout as predictedless

Rings at 0.5×, 1× and 2×. Widest outward: Decision Sciences, 5.2×. Every wedge is a field page.

All 22 fields, with their numbers
  1. Decision Sciences5.23×4 works
  2. Veterinary2.92×0 works
  3. Biochemistry, Genetics and Molecular Biology2.78×12 works
  4. Economics, Econometrics and Finance2.46×4 works
  5. Mathematics2.45×2 works
  6. Health Professions2.36×5 works
  7. Medicine2.17×33 works
  8. Pharmacology, Toxicology and Pharmaceutics2.03×1 works
  9. Neuroscience1.82×2 works
  10. Computer Science1.30×8 works
  11. Immunology and Microbiology1.22×1 works
  12. Psychology0.87×2 works
  13. Environmental Science0.22×1 works
  14. Nursing0.17×0 works
  15. Engineering0.15×2 works
  16. Arts and Humanities0.13×0 works
  17. Materials Science0.11×0 works
  18. Physics and Astronomy0.09×0 works
  19. Social Sciences0.09×1 works
  20. Business, Management and Accounting0.06×0 works
  21. Agricultural and Biological Sciences0.04×0 works
  22. Earth and Planetary Sciences0.01×0 works

Who are the top researchers at Critical Path Institute?

Ranked on the quality score, Diane T. Stephenson, Debra L. Hanna and Bill Byrom lead among researchers whose main affiliation is Critical Path Institute.

  1. 1 Diane T. Stephenson United States · #285,157 worldwide 7.7k citations · 183 works
  2. 2 Debra L. Hanna United States · #358,504 worldwide 2.6k citations · 50 works
  3. 3 Bill Byrom United States · #413,186 worldwide 1.8k citations · 89 works
  4. 4 Sonya Eremenco United States · #507,319 worldwide 8.9k citations · 96 works
  5. 5 Matthew N. Ezewudo United States · #585,784 worldwide 1.3k citations · 27 works
  6. 6 Emily C. Turner United States · #749,467 worldwide 1k citations · 22 works
  7. 7 Celeste A. Elash United States · #792,235 worldwide 1.2k citations · 21 works
  8. 8 Klaus Romero United States · #867,260 worldwide 3.8k citations · 141 works
  9. 9 Inish M. O’Doherty United States · #920,359 worldwide 1.2k citations · 23 works
  10. 10 Jane Larkindale United States · #922,726 worldwide 6.1k citations · 56 works
All ranked researchers at Critical Path Institute

What are the most cited papers from Critical Path Institute?

The most cited paper from Critical Path Institute is "Diagnostic Assessment of Deep Learning Algorithms for Detection of Lymph Node Metastases in Women With Breast Cancer" (Babak Ehteshami Bejnordi et al., 2017), with 3,405 citations. Next come "Resistance to Change: The Rest of the Story" (1,083) and "The Reward Deficiency Syndrome: A Biogenetic Model for the Diagnosis and Treatment of Impulsive, Addictive and Compulsive Behaviors" (979).

Most cited papers
#PaperReleasedCitations
1 Diagnostic Assessment of Deep Learning Algorithms for Detection of Lymph Node Metastases in Women With Breast Cancer Babak Ehteshami Bejnordi et al. · JAMA Open access 12 Dec 2017 3,405
2 Resistance to Change: The Rest of the Story Jeffrey D. Ford, Laurie W. Ford, Angelo D'Amelio · Academy of Management Review Apr 2008 1,083
3 The Reward Deficiency Syndrome: A Biogenetic Model for the Diagnosis and Treatment of Impulsive, Addictive and Compulsive Behaviors Kenneth Blum, Eric R. Braverman, Jay M. Holder et al. · Journal of Psychoactive Drugs Nov 2000 979
4 Validity of the Symbol Digit Modalities Test as a cognition performance outcome measure for multiple sclerosis Ralph H. B. Benedict, John DeLuca, Glenn A Phillips et al. · Multiple Sclerosis Journal Open access 16 Feb 2017 867
5 Apolipoprotein E Genotype and Sex Risk Factors for Alzheimer Disease Scott Neu et al. · JAMA Neurology Open access 28 Aug 2017 691
All 60 most cited papers, with filters and sorting

Which keywords describe research at Critical Path Institute?

By fractional works in 2022-now, weighted toward what it does more of than the world: Machine Learning, Precision Medicine, Predictive Modeling, Medical Imaging, Feature Extraction, Quantitative Analysis, Radiomics and Economic Evaluation.

▲ more of its work than of the world's◆ about the world's share▼ less than the world's

Size is fractional works in 2022-now in the topics tagged with each word; colour is the word's share of this institution's work against its share of the world's. The 40 words are chosen for being large and distinctive. Each links to the topic it comes from most.

All 40 words, with their numbers
  1. Machine Learning13▲ 4.8×15 topics
  2. Precision Medicine6▲ 16×6 topics
  3. Medical Imaging5▲ 13×3 topics
  4. Predictive Modeling5▲ 24×2 topics
  5. Deep Learning5▲ 1.83×13 topics
  6. Epidemiology4▲ 1.42×30 topics
  7. Feature Extraction4▲ 12×2 topics
  8. Quantitative Analysis4▲ 26×1 topic
  9. Radiomics4▲ 47×1 topic
  10. Oxidative Stress4▲ 3.1×16 topics
  11. Quality of Life4▲ 3.4×9 topics
  12. Biomarkers3▲ 5.8×8 topics
  13. Economic Evaluation3▲ 34×2 topics
  14. Clinical Trials3▲ 5.9×8 topics
  15. Healthcare3▲ 3.5×5 topics
  16. Parkinson's Disease3▲ 16×6 topics
  17. Cost-effectiveness Analysis3▲ 43×1 topic
  18. Health Utility Measures3▲ 43×1 topic
  19. Mitochondrial Dysfunction2▲ 10×8 topics
  20. Neurodegeneration2▲ 9.7×6 topics
  21. Gene Expression2▲ 4.7×6 topics
  22. Targeted Therapy2▲ 12×3 topics
  23. Bayesian Methods2▲ 51×2 topics
  24. Data Integration2▲ 15×4 topics
  25. Health Equity2▲ 8.7×2 topics
  26. Quality Assessment2▲ 14×3 topics
  27. Adaptive Designs2▲ 117×1 topic
  28. Dopaminergic Neurons2▲ 37×2 topics
  29. False Discovery Rate2▲ 117×1 topic
  30. Medical Image Analysis2▲ 13×2 topics
  31. Pharmacokinetics2▲ 9.0×3 topics
  32. Type 1 Diabetes2▲ 29×2 topics
  33. Computer-Aided Detection2▲ 26×1 topic
  34. Electronic Health Records2▲ 21×2 topics
  35. Histopathology Images2▲ 26×1 topic
  36. Molecular Docking2▲ 17×1 topic
  37. Semantic Web2▲ 23×2 topics
  38. Virtual Screening2▲ 24×1 topic
  39. Forecasting2▲ 11×2 topics
  40. Publication Bias2▲ 44×2 topics

Which research topics does Critical Path Institute publish most on?

By volume in 2022-now: Radiomics and Machine Learning in Medical Imaging, Health Systems, Economic Evaluations, Quality of Life, Statistical Methods in Clinical Trials and AI in cancer detection.

  1. 1 Radiomics and Machine Learning in Medical Imaging Radiology, Nuclear Medicine and Imaging 4 works
  2. 2 Health Systems, Economic Evaluations, Quality of Life Economics and Econometrics 3 works
  3. 3 Statistical Methods in Clinical Trials Statistics and Probability 2 works
  4. 4 AI in cancer detection Artificial Intelligence 2 works
  5. 5 Computational Drug Discovery Methods Computational Theory and Mathematics 2 works
  6. 6 Cancer Genomics and Diagnostics Cancer Research 2 works
  7. 7 Biomedical Text Mining and Ontologies Molecular Biology 2 works
  8. 8 Parkinson's Disease Mechanisms and Treatments Neurology 1 works
  9. 9 Meta-analysis and systematic reviews Statistics, Probability and Uncertainty 1 works
  10. 10 Psychometric Methodologies and Testing Management Science and Operations Research 1 works

How open and international is its research?

Against the world's own shares: the tick on each track. Both are shares of its output, so they sit on one scale and can be read against each other as well as against the world.

openly available48.1%not open51.9%

World: 40% of research is openly available.

with international co-authors32.5%domestic only67.5%

World: 18% is written across borders.

How has Critical Path Institute's research output changed?

Output in 2022-2025 was 41% higher than in 2018-2021.

still counting1990200020102020
grewheldshrank

The same series as a ribbon: one cell per year, darker for more. The line above answers how much; this answers when.

Its share of all research

Growing output can still be a shrinking share: all of science grows. This is Critical Path Institute as a percentage of every work published that year, 0.00035% in 2024.

still counting0.00050%0.0010%Critical Path Institute0.00026% in 202519801990200020102020

Fractional works of Critical Path Institute over all fractional works that year. How the balance of science has shifted.

Other research institutions in Tucson

All research institutions in Tucson

Share Critical Path Institute's ranking

Critical Path Institute on Science Explorer

A card with Critical Path Institute's standing and the fields it leads in, for a post or a slide. A link to this page previews as the same card.

Download the card

1200 × 630 PNG, sized for social posts, drawn from the latest snapshot.

Badges for a website1Each links back here and updates with every snapshot

Research measures only: rankings here say nothing about teaching, admissions or student experience. Comparable institutions and collaboration partners have tabs of their own, above.

Discussion

Ask a question or share a note about Critical Path Institute. Keep it to the research: no personal attacks, advertising or links. Any reader can report a post, which collapses it for everyone until it is opened.