Willy Herroelen
Willy Herroelen publishes mostly in Management Science and Operations Research, Industrial and Manufacturing Engineering and Information Systems, on topics such as Resource-Constrained Project Scheduling, Scheduling and Optimization Algorithms and Construction Project Management and Performance.
- World rank
- #343,473 of 7,710,434 ranked researchers
- Rank in Belgium
- #2,772 of 67,186
- Works
- 195
- Citations
- 7.9k
- Citations per work
- 40.4
What does Willy Herroelen research?
Willy Herroelen's work is mostly in Decision Sciences (41%), Engineering (34%), Computer Science (7%).
Their six largest subfields, inside their fields and domains; the grey slice is everything else they publish. The interactive view splits every one of their works down to single topics.
The fields and subfields, with their numbers
- Social Sciences8443.3%
- Physical Sciences8040.8%
- Engineering6634.1%
- Computer Science136.7%
- Everything else3115.9%
- 1Management Science and Operations Research41% of their works
- 2Industrial and Manufacturing Engineering30% of their works
- 3Information Systems4% of their works
- 4Building and Construction4% of their works
- 5Management Information Systems2% of their works
- 6Computer Networks and Communications2% of their works
Research topics
- Resource-Constrained Project Scheduling
- Scheduling and Optimization Algorithms
- Construction Project Management and Performance
- Operations Management Techniques
- Manufacturing Process and Optimization
- Software Engineering Techniques and Practices
- Advanced Manufacturing and Logistics Optimization
- BIM and Construction Integration
Which keywords describe Willy Herroelen's research?
The keywords of their largest research topics: Genetic Algorithm, Project Scheduling, Resource-Constrained, Manufacturing, Scheduling, Risk Management, Construction Projects and Project Success.
- Construction
- Warehouse Design
- Empirical Studies
- Design for Manufacture
- Theory of Constraints
- Project Success
- Risk Management
- Manufacturing
- Project Scheduling
- Genetic Algorithm
- Resource-Constrained
- Scheduling
- Construction Projects
- Operations Management
- Assembly Planning
- Agile Software Development
- Order Picking
- BIM
Size is their works in the topics tagged with each word, from their 8 largest topics. Each links to the topic it comes from most. The words come from the keyword list OpenAlex gives each topic, not from the text of the papers, so a word can appear that none of the papers uses.
All 18 words, with their numbers
- Genetic Algorithm2122 topics
- Project Scheduling1171 topic
- Resource-Constrained1171 topic
- Manufacturing951 topic
- Scheduling951 topic
- Risk Management562 topics
- Construction Projects411 topic
- Project Success411 topic
- Operations Management241 topic
- Theory of Constraints241 topic
- Assembly Planning201 topic
- Design for Manufacture201 topic
- Agile Software Development181 topic
- Empirical Studies181 topic
- Order Picking161 topic
- Warehouse Design161 topic
- BIM151 topic
- Construction151 topic
Where does Willy Herroelen work?
Willy Herroelen's main affiliation in the publication record is KU Leuven, Belgium.
How many publications and citations does Willy Herroelen have?
OpenAlex counts 195 works and 7,881 citations for Willy Herroelen, an h-index of 41, ranking #343,473 of 7,710,434 researchers worldwide on the quality score.
Ranked on field-normalised citation excellence (50%), output (30%) and citations (20%). Counts come from OpenAlex author records, which occasionally merge different people who share a name or split one person into several.
Papers, co-authors, who cited this work and researchers on the nearest topics have tabs of their own, above. Is this your page? Claim it with your ORCID iD, or request a correction or removal.
Discussion
Ask a question or share a note about Willy Herroelen. Keep it to the research: no personal attacks, advertising or links. Any reader can report a post, which collapses it for everyone until it is opened.