Saman Aminbakhsh
Saman Aminbakhsh publishes mostly in Management Science and Operations Research, Industrial and Manufacturing Engineering and Building and Construction, on topics such as Resource-Constrained Project Scheduling, BIM and Construction Integration and Scheduling and Optimization Algorithms.
- World rank
- #2,679,496 of 7,710,434 ranked researchers
- Rank in Türkiye
- #15,139 of 117,622
- Works
- 19
- Citations
- 741
- Citations per work
- 39.0
What does Saman Aminbakhsh research?
Saman Aminbakhsh's work is mostly in Engineering (38%), Decision Sciences (29%), Computer Science (11%).
Their six largest subfields, inside their fields and domains; the grey slice is everything else they publish. The interactive view splits every one of their works down to single topics.
The fields and subfields, with their numbers
- Physical Sciences949.2%
- Engineering738.2%
- Computer Science211.0%
- Social Sciences629.1%
- Decision Sciences629.1%
- Everything else421.7%
- 1Management Science and Operations Research29% of their works
- 2Industrial and Manufacturing Engineering16% of their works
- 3Building and Construction14% of their works
- 4Civil and Structural Engineering7% of their works
- 5Computational Theory and Mathematics6% of their works
- 6Artificial Intelligence6% of their works
Research topics
- Resource-Constrained Project Scheduling
- BIM and Construction Integration
- Scheduling and Optimization Algorithms
- Construction Project Management and Performance
- Advanced Multi-Objective Optimization Algorithms
- Topology Optimization in Engineering
- Additive Manufacturing and 3D Printing Technologies
- Operations Management Techniques
Which keywords describe Saman Aminbakhsh's research?
The keywords of their largest research topics: Genetic Algorithm, Risk Management, Project Scheduling, Resource-Constrained, Sustainability, BIM, Construction and Manufacturing.
- Theory of Constraints
- Materials
- Sensitivity Analysis
- Level Set Method
- Project Success
- Additive Manufacturing
- Manufacturing
- BIM
- Resource-Constrained
- Risk Management
- Genetic Algorithm
- Project Scheduling
- Sustainability
- Construction
- Scheduling
- Construction Projects
- Evolutionary Algorithms
- Multiobjective Optimization
- 3D Printing
- Operations Management
Size is their works in the topics tagged with each word, from their 8 largest topics. Each links to the topic it comes from most. The words come from the keyword list OpenAlex gives each topic, not from the text of the papers, so a word can appear that none of the papers uses.
All 20 words, with their numbers
- Genetic Algorithm183 topics
- Risk Management102 topics
- Project Scheduling91 topic
- Resource-Constrained91 topic
- Sustainability82 topics
- BIM61 topic
- Construction61 topic
- Manufacturing61 topic
- Scheduling61 topic
- Additive Manufacturing52 topics
- Construction Projects41 topic
- Project Success41 topic
- Evolutionary Algorithms31 topic
- Level Set Method31 topic
- Multiobjective Optimization31 topic
- Sensitivity Analysis31 topic
- 3D Printing21 topic
- Materials21 topic
- Operations Management21 topic
- Theory of Constraints21 topic
Where does Saman Aminbakhsh work?
Saman Aminbakhsh's main affiliation in the publication record is Atilim University, Türkiye.
How many publications and citations does Saman Aminbakhsh have?
OpenAlex counts 19 works and 741 citations for Saman Aminbakhsh, an h-index of 9, ranking #2,679,496 of 7,710,434 researchers worldwide on the quality score.
Ranked on field-normalised citation excellence (50%), output (30%) and citations (20%). Counts come from OpenAlex author records, which occasionally merge different people who share a name or split one person into several.
Papers, co-authors, who cited this work and researchers on the nearest topics have tabs of their own, above. Is this your page? Claim it with your ORCID iD, or request a correction or removal.
Discussion
Ask a question or share a note about Saman Aminbakhsh. Keep it to the research: no personal attacks, advertising or links. Any reader can report a post, which collapses it for everyone until it is opened.